VMV - VIRTUAL MUSEUM VALLEE
Italiano Français English
HOME   NEWS   PROJECT   PARTNERS   EDUCATIONAL WORKSHOPS   SEND PICTURES   CONTACTS   LINK  
Museums Keyword
Advanced search Advanced search
VMVMAOThe district of AostaPublic Works

THE DISTRICT OF AOSTA

PUBLIC WORKS

Aosta is changing every day. Some new roads and new buildings design constantly its character. These pictures depict a town that does not exist anymore and stands only in our memories.
Permanent collection- No. of index cards:80

Gallery

SEE GRID
SEE LIST
Holiday camps
Carnivals
Aosta in summer
Christmas holidays
Public Works(80)
 Guided visit…
index card collection:80 page 3 of 5 photo per page:  12 16 20 return -  1 2 3 4 5  - go forwards
Stipel piping works in the streets of the town Beginning of the street building works in Larovoire village Some children are watching the new children gardens Asphalt works of Cavalieri di Vittorio Veneto square

Stipel piping works in the streets of the town

Beginning of the street building works in Larovoire village

Some children are watching the new children gardens

Asphalt works of Cavalieri di Vittorio Veneto square
ENLARGE ENLARGE ENLARGE ENLARGE
 Mazzini street construction Widening of Vevey street and brook piping Beginning of the widening works and canal covering in Guido Rey street Covering works of the canal in Guido Rey street

Mazzini street construction

Widening of Vevey street and brook piping

Beginning of the widening works and canal covering in Guido Rey street

Covering works of the canal in Guido Rey street
ENLARGE ENLARGE ENLARGE ENLARGE
Beginning of the widening works and canal covering in Guido Rey street Beginning of the widening works and canal covering in Guido Rey street New Guido Rey street at the end of the works Demolition work in De Challand street

Beginning of the widening works and canal covering in Guido Rey street

Beginning of the widening works and canal covering in Guido Rey street

New Guido Rey street at the end of the works

Demolition work in De Challand street
ENLARGE ENLARGE ENLARGE ENLARGE
Basements are carved to build the new building Basements are carved to build the new building in Challand street De Challand street asphalt works De Challand street asphalt works

Basements are carved to build the new building

Basements are carved to build the new building in Challand street

De Challand street asphalt works

De Challand street asphalt works
ENLARGE ENLARGE ENLARGE ENLARGE
return -  1 2 3 4 5  - go forwards
collezioni permanenti
esposizioni temporanee mao mumu
spazio scuole vmv
privacy | legal | partners | contacts © 2019 Virtual Museum Vallée 
Regione Autonoma Valle d'Aosta - c.f. 80002270074 
siti web valle d'aosta - siti internet aosta